facebook twitter Blogger YouTube
Welcome to Wilkes University » Latest News Archives
Font Size: T T T

Latest News Archives

Crane Set Up

 

There will be a crane set up to lift materials needed to repair a hot water boiler in the penthouse of the Henry Student Center.  The crane will be set up in the driveway behind the Student Center between 8:00 am and 12 Noon on Wednesday, March 6, 2013. The driveway will be blocked off so no one can enter from or exit to River Street. Thank you for your cooperation.

 

Published On: 3/5/2013
  • |
  • Wilkes University |
  • 84 West South Street, Wilkes-Barre, PA 18766 |
  • 1-800-WILKES-U
  • |
  • Privacy Policy*